Skip to main content

Clover Valley Lumber #4

Technical Data

Builder Baldwin Locomotive Works
Number 57684
Date March 1924
Type 2-6-6-2T
Cylinders 26 x 24 inches
Drivers 45 inches
Boiler Pressure 200 PSI
Gross Weight 110 tons
Tractive Effort 37,500lbs

History

  • Built new as Clover Valley Lumber Co. No. 4, Loyalton, CA
  • Feather River Lumber Co. No. 4, Loyalton, CA
  • Tahoe Timber Co. of Nevada (stationary boiler use only), Verdi, NV
  • Acquired by PLA, July 1973
  • In service, Castro Point Railway, 1973 to 1985
  • Stored serviceable, Niles Canyon Railway, Sunol, CA

The movement of the Mallet to our museum facility at Castro Point had to be one of the major undertakings while at that facility. The locomotive sat on an isolated piece of track in a field just west of Reno, Nevada where she had been placed when the lumber mill that had been in that area had been torn down.

Baldwin had started the construction of tank mallets in 1910; by 1924, when the Number 4 had been built, the design had been perfected. Two sizes in one of four models were available to those interested in obtaining one of these locomotives. The models included a tender version, a side tank version, a full saddle tank model, and a split saddle tank version. It was to be the split saddle tank version that was to prove the most popular, and one of the first of these was the Number 4. Today, only one split saddle tank mallet remains, and that is the Number 4. It is interesting to note that at least one of each of the other models remains. The group at Puget Sound has both a tender version as well as a full saddle tank model, while a side tank model belongs to Pete Replinger at Shelton, Washington. A number of other logging mallets also remain, but they have been modified from their original design.

The Number 4 was built for the Clover Valley Lumber Company and operated out of Loyalton, California which is not too far from Portola. About 1956, the Clover Valley Lumber Company sold out to the Feather River Lumber Company, but the rail operation remained the same. In late 1957, the railroad became history when the logging operation switched to trucks. It was at this time the Number 4 was sent to the Tahoe Timber Company's mill near Reno for stationary boiler service. That service lasted only a few weeks, but the locomotive was to remain there for many years.

In 1973, the late Greg Gregory who was a P.L.A. member living in Reno, arranged for the donation of the locomotive to the Association. The real problem was in moving the locomotive. Frank Fontes, a person I have mentioned previously, undertook the physical work of moving the locomotive. The first thing he did was to make a trip to Reno in order to secure those items that still remained on the locomotive to prevent them from being stolen. He was fortunate to have a letter granting the necessary permission to carry out that work, as he had hardly started, when an individual showed up with a shotgun wondering what he was doing. The letter saved him. He returned with the headlights and spot plate, but the bell, whistle and builders' plates had already been stolen.

Not one, but two moves were required in order to get the locomotive off the property in Nevada. The locomotive was sitting in a position where it could not be loaded on either a flatcar or a truck. There was a spur track about a third of a mile away, and using snap track and a small crane, a weekend was spent moving the locomotive to that spur track. Once on the spur track, Frank returned to Reno and pulled the front or low-pressure engine out from under the locomotive. In all, I think Frank made about eight or nine trips to Reno in order the get the locomotive moved.

The big day for the move was scheduled for the week of July 8th, 1974. To make things interesting, it rained on the 8th and 9th, which was the first time it had rained on those dates in Reno's history. It had been Dave Burla and I who had planned the actual logistics of the move, but neither of us counted on the trucks that were going to handle the Mallet of having mechanical problems. The primary truck broke down and did not make Reno until Wednesday (it was supposed to arrive on Monday), and it promptly broke down again. In sympathy, the smaller truck, which was to carry the low-pressure engine, also broke down. While we had a large crew on hand, the delay caused most of them to leave, and left only a handful of us to remain to carry on the loading work. In addition to myself, there was Dave Burla, Warren Smith, Bud Shaver, Frank Fontes, and his son, who handled the loading job. Today, only Warren, Dave, and I remain in the Association and can remember the wonderful time watching the rain falling in Reno.

The actual move went just as planned, with the low-pressure engine arriving on Thursday and the rest of the locomotive on Friday. The unloading went smoothly; fortunately, the truck did not break down again until after the locomotive was off the trailer. The truck ended up spending the weekend at Castro Point undergoing repairs.

With the exception of reinstalling the low-pressure engine to the rest of the locomotive, and giving the Number 4 a new coat of paint, little was done to the locomotive until after the Standard Oil operation in 1977. The Standard Oil operation consisted of a special train operating over most of the Richmond Belt (with permission), using the Number 2 as power. From the experience gained with the operation, it was obvious that we needed additional passenger equipment, and two locomotives, both of which were more powerful than the Number 2. Heisler Number 5 was selected as one of the locomotives, while the Number 4 was selected to be the other.

While the Number 5 was operational, the Mallet needed work, and it was started almost immediately. Probably the largest boiler problem concerned the superheater flues, which had been damaged while in stationary boiler service. "Bones" Andrews went to work and installed new ends to these flues, and a few weeks later, they were like new. In the summer of 1978, the work was complete, and she was steamed up for the first time in twenty years. There proved to be few problems, and the Number 4 was put into the pool of operational locomotives. However, a week before the scheduled Standard Oil venture, the operation was cancelled and thus the Number 4 never did handle the train for which she had been restored to operation. Originally the Number 4 was lettered for the Castro Point Railway, but around 1980, Lou Bradas and Jon Kirchanski repainted and lettered the locomotive to what she had been on the Clover Valley Lumber Company.

Between 1978 and the end of 1985, the Number 4 was in regular operation at Castro Point. In addition to passenger operation, she was also called on to carry out special operations on occasion. One of these was the movement of the former Western Pacific F-7, No. 918, into our facility at Molate Beach in 1982.

On December 1, 1985, Mallet Number 4 had the honor of handling the last passenger movement on the Castro Point Railway. When the Number 4 arrived at Molate Beach, the passenger carrying days on the railroad were over.

In late 1986, along with Heisler 5 and Shay 7, the Number 4 was moved out of Castro Point to Niles via a special train movement. The locomotives were put in storage along with other P.L.A. equipment, and the Number 4 remains at that location at the present time. I know that a number of members wait for the day that the Number 4 is brought to the canyon and put into service. She will make a fine sight in operation.

 

Donate to this project Visit Steam Department website